construction and infrastructure

construction and infrastructure

THE ENVIRONMENT

THE ENVIRONMENT

Equipment that cannot fail mid-shift.

Equipment that cannot fail mid-shift.

Equipment that cannot fail mid-shift.

Construction sites are never static: the work face moves weekly, equipment is moved, stacked and re-deployed, and rental gear has to survive operator after operator. Conssin light towers and floodlights set up fast, hold up to rough handling and give every night shift a fully lit, powered site.

Construction sites are never static: the work face moves weekly, equipment is moved, stacked and re-deployed, and rental gear has to survive operator after operator. Conssin light towers and floodlights set up fast, hold up to rough handling and give every night shift a fully lit, powered site.

Construction sites are never static: the work face moves weekly, equipment is moved, stacked and re-deployed, and rental gear has to survive operator after operator. Conssin light towers and floodlights set up fast, hold up to rough handling and give every night shift a fully lit, powered site.

THE CHALLENGE

THE CHALLENGE

What this jobsite throws at equipment

What this jobsite throws at equipment

What this jobsite throws at equipment

01

Night-shift blind spots

Night-shift blind spots

Shadows at edges, scaffolding and trenches create trip and strike hazards after dark.

Shadows at edges, scaffolding and trenches create trip and strike hazards after dark.

02

Constant re-positioning

Constant re-positioning

Light and power must relocate as the project advances — fixed installs cannot keep up.

Light and power must relocate as the project advances — fixed installs cannot keep up.

03

Rental-grade abuse

Rental-grade abuse

Fleet equipment faces rough transport, setup by different crews and minimal downtime tolerance.

Fleet equipment faces rough transport, setup by different crews and minimal downtime tolerance.

04

No grid on site

No grid on site

Early-stage sites and roadworks often have no mains power for lighting or tools.

Early-stage sites and roadworks often have no mains power for lighting or tools.

THE CONSSIN ANSWER

THE CONSSIN ANSWER

Engineered light and power for exactly these conditions

Engineered light and power for exactly these conditions

Engineered light and power for exactly these conditions

01

01

Deployable light towers

Deployable light towers

Deployable light towers

Portable towers with electric masts set up in minutes and fold down for transport between sites.

Portable towers with electric masts set up in minutes and fold down for transport between sites.

Portable towers with electric masts set up in minutes and fold down for transport between sites.

02

02

Rental-tough build

Rental-tough build

Rental-tough build

IP67/IP69K sealing, IK10 optics and validated vibration resistance for repeated deployment.

IP67/IP69K sealing, IK10 optics and validated vibration resistance for repeated deployment.

IP67/IP69K sealing, IK10 optics and validated vibration resistance for repeated deployment.

03

03

Off-grid power built in

Off-grid power built in

Off-grid power built in

Integrated LiFePO4 battery packs enable solar/hybrid towers and silent overnight operation.

Integrated LiFePO4 battery packs enable solar/hybrid towers and silent overnight operation.

Integrated LiFePO4 battery packs enable solar/hybrid towers and silent overnight operation.

04

04

Coverage where you need it

Coverage where you need it

Coverage where you need it

250–500W floodlights deliver broad, glare-controlled beams over work zones and access roads.

250–500W floodlights deliver broad, glare-controlled beams over work zones and access roads.

250–500W floodlights deliver broad, glare-controlled beams over work zones and access roads.

Contact Us

CONSSIN corporation

CONSSIN corporation

CONSSIN corporation

23 years of expertise.

23 years of expertise.

23 years of expertise.

1,000,000+ units delivered.

1,000,000+ units delivered.

1,000,000+ units delivered.

600+ clients across 30+ countries.

600+ clients across 30+ countries.

600+ clients across 30+ countries.

Tell us your requirements — our team responds within 24 hours.

Tell us your requirements — our team responds within 24 hours.